Jacks, Victoria's home services marketplace. Local skills, on demand.

Do You Need a Permit for a Secondary Suite in Kelowna, BC?

By Jacks, 2026-11-16

Yes. The City of Kelowna requires a building permit to create a secondary suite, whether you're finishing a basement, converting existing space, or including a suite in a new build. With Kelowna's tight rental market and student demand near UBCO, plenty of homeowners are adding one. Doing it with a permit protects your rental income, your insurance, and your resale value.

The City's Ground Rules

Kelowna's current secondary suite bulletin sets out the basics:

The city also asks you to contact your water utility and FortisBC before construction, since a suite can change your utility setup.

Building Code Requirements

Suites have to meet the BC Building Code. The items that come up most in basement conversions are:

Permits and Inspections

Submit drawings with your building permit application. Electrical and plumbing work needs licensed trades and their own permits. Inspectors visit at set stages, so plan the work around those visits before walls close up.

Legalizing an Existing Suite

If your home already has an unpermitted suite, you can bring it through the same process. Expect some walls opened for inspection and upgrades where the original work falls short of code.

Rules change, so confirm the current requirements with the City of Kelowna's building and permitting department before you start. Our electrician cost guide covers one of the trades a suite needs.

Jacks is bringing its home maintenance marketplace to Kelowna, connecting homeowners with local, independent, insured tradespeople. Join the waitlist to hear when it launches.